Product search
Mingbang Ahout Us
Home: PRODUCTS / Wall Paint
 
   
Wall Paint


According to the characteristics and climatic environment in which the building, using a variety of special materials developed from weathering, pollution is the most typical characteristics of the building with excellent decorative effect and long-lasting protection.

e适用范围.jpg

Applicable to all types landmark, Villa, star hotels, luxury clubs, senior housing and other buildings facades ho Chinese decoration. Can be applied to concrete, plasterboard, brick walls, cement asbestos board walls.


e性能特点.jpg
Anti-aging, anti-UV performance, superior stain resistance, excellent moisture scrub, mildew, algae, anti-alkali excellent excellent hiding power, leveling and construction of super excellent adhesion, film solid and lasting, the film has excellent permeability with good gloss and color retention

e技术参数.jpg

Dilution: aqueous dilution with water, dilution rate does not exceed 30%; oil diluted with diluent rate does not exceed 10%, need Stir before using. 

Theoretical consumption of paint: 13 m2 / l / times (dry film thickness of 30 microns); due to different roughness and surface dilution ratio of actual construction, consumption of paint is different. 

Drying time: Surface dry: 30 minutes; Hard dry: 60 minutes; hard work: 7 days. 

Recoat: 2-4 hours (25 ℃ meter). 

Gloss: silk / matt. 

Color: white or a variety of other color in (detailed color refer to color card). 

Construction method: roller coating, brushing, spraying. 

Construction environment: more than 8 ℃, relative humidity less than 85%. 

Substrate treatment: painted grass moisture content not exceeding 10%, the base surface must be firm, smooth, clean, no oil, no loose material, neutral (PH value = 7 to 9), please brushing again before topcoat the company supporting the primer. 

Cleaning: All tools after use, wash with water.


e施工指导.jpg

1, after opening cans Stir liquid paint tank, construction gap should be tightly closed lid to prevent crust paint, liquid paint diluted fail back into the original packaging. 

2, winter construction, recoat time, please be extended; For walls, winter curing time should be extended to prevent the precipitation of alkaline substances, erosion walls. 

3, when the temperature is below 8 ℃ do construction relative humidity greater than 85%. 

4, please use the state faction supporting the construction of a primer to ensure construction quality. 

Construction conditions: The above 0 ℃, airtight stored in a cool dry place.

顶部微信二维码底部
扫描二维码关注我为好友